The Advanced Reactor Materials Problem: TRISO, Graphite, and the Supply Chains That Don’t Exist Yet
The reactor designs are ready. The fuel took twenty years to qualify, no graphite grade is code-qualified yet, and half a dozen other materials have no supply chain. A reactor engineer on why materials — not the reactor — are the real limit on advanced nuclear.
